AMA University Answers
Login
Register
AMA OED
Courses
IT
IT-6224
The trunk link between two 296...
The trunk link between two 2960 switches has reached its capacity. How can solve this problem in the most economical way?
Combine physical ports into a high-speed logical link by configuring EtherChannel.
Correct
Feedbacks
ComprehensiveSpider
-
2 years ago
Upvoted this question
Similar IT-6224 questions
This wireless attack comes from an old term called war dialing, where people would dial random phone...
This always appear in certification exams so remember this, which parameter or parameters are used t...
The backbone area interconnects with all other OSPF area types.
The network specialist has manually configured the hello interval to 15 seconds on an interface of a...
The network engineer of Stark Industries has manually configured the hello interval to 15 seconds on...
A good example of our learning in chapter 9 is what code in the Cisco IOS 15 image filename C1900- U...