Your browser does not support JavaScript!

Application Life Cycle Management

Showing 76-150 of 272 answers

Enables you to increase the number of parallel calculations performed on an entire site.
  • Advanced Area Correct
Enables you to instruct ALM to automatically send a status alert email to the author when the test set completes execution.
  • Set automation options Correct
Enables you to manage resources used by your tests. You can organize your resources by defining a hierarchical Test Resource tree containing resource folders and resources.
  • Test Resources Correct
Enables you to manage the execution of manual and automated tests and document their results.
  • Run the tests Correct
Enables you to purge calculations after a specific time period.
  • Purge Area Correct
Enables you to record additional details about the actual test execution results.
  • Actual Field Correct
Enables you to schedule PPT calculations for your entire site.
  • Scheduling Area Correct
Enables you to view and change the values of fields specified for the selected requirement
  • Details Correct
Enables you to view requirements in a flat non-hierarchical view.
  • Requirements Grid Correct
Enables you to view traceability relationships between requirements and other requirements or tests in a matrix.
  • Traceability Matrix Correct
Enables you to view your requirements hierarchically in a tree.
  • Requirement Tree Correct
Excludes the selected requirement from the conversion process
  • exclude from conversion Correct
Export library in ALM enables you to share and reuse and existing set of entities.
  • True
  • False Correct
For which modules does the Automail customisation feature apply?
  • Only Defects Correct
From the Testing menu, it enables to run the tests on an application and analyze the results
Answer: test lab
From what part of the Menu in ALM enables to define release, libraries and specify the testing requirements?
Answer: management
have been made in many areas of the product, such as opening, loading, and running tests.
  • Performance Improvements Correct
Having a direct link between a defect and a test has an implication of what?
  • The defect is indirectly linked to the related Requirement. Correct
Identify the name of this icon, that captures and attaches information about the computer
Answer: system information
If an application flaw is detected while running a test set, you can submit a defect.
  • True Correct
If test instances are present in multiple test sets, you can associate defects with test instances to ensure easy traceability.
  • TRUE Correct
If the first row of the Excel worksheet contains column names, hose column names must exactly correspond to field names.
  • True
  • False Correct
If you begin to make changes to an entity in a version control-enabled project, you are prompted to check in the entity.
  • FALSE Correct
If you know that a test in your test set might fail, but you want to make sure that subsequent tests in the test set still execute, which of the following should you do?
  • Ensure that the execution condition for the arrow running out from the test is set to Finished. Correct
If you want to make changes to an entity in a version control enabled project, what is the first thing you must do?
  • Check out the entity Correct
If you would like to revert an entity to a previous version, which of the following actions would you take?
  • Promote the entity Correct
Imported libraries functionality is available for the HP ALM and HP ALM Performance Center editions.
  • True Correct
  • False
In a version control-enabled project, you can only make changes to an entity by checking it in.
  • FALSE Correct
In Cross-Project Graph, ALM provides two ways to create a graph using Dashboard module, New Graph menu item and?
Answer: graph wizard
In generating a live Analysis Graph, this type of graph displays the number of tests that are present in the selected test subject folder at specific points during a period of time
Answer: progress
In Modifying the Libraries Tree, to compare two versions, press the Ctrl key, select version and click on compare button. The compare Entities <Entity> dialog box opens showing the Field Name, the field values in the two versions and a Changes column, indicating the type of change.
  • True Correct
  • False
In Modifying the Libraries Tree, you can compare two baseline when the same base line belongs to the same library. To compare two baselines, press the Ctrl key, select the baselines and click on Compare button.
  • True Correct
  • False
In performing risk-based quality management, it is the determination on how the critical requirement is for the business.
  • Risk-Based Setting
  • Traceability Matrix
  • Defect Linkage
  • Establish Business Criticality Correct
In the _________, you analyze ALM data by creating graphs, project reports, and Excel reports.
  • Dashboard modules Correct
In the dashboard pages, you can arrange and view multiple graphs on a single page.
  • TRUE Correct
In the definition phase, the QA/project manager defines the scope, milestones, and KPIs for the project in ALM.
  • False Correct
In traceability links, this enables you to add and remove traceability links between requirements
Answer: Relationships
Indicates the component of the application on which the requirement is based.
  • Product Correct
Indicates the cycle to which the requirement is assigned.
  • Target cycle Correct
Indicates the execution status of tests that are linked to a requirement.
  • Direct Cover Status Correct
Indicates the name of the user who created the requirement.
  • Author Correct
Indicates the release to which the requirement is assigned.
  • Target Release Correct
Indicates the type of the requirement, which may be business, folder, functional, group, testing, or undefined.
  • Requirement Type Correct
Indicates whether the requirement has been reviewed and approved.
  • Reviewed Correct
Indicates whether the scheduled calculation is currently running.
  • Active/Inactive Correct
is a snapshot of your library at a specific point in time It also enables you to keep track of changes made to your project over time
Answer: baseline
It breaks the logjam by providing fast, compliant test data.
  • HP Fortify/Application Security Center
  • HP Sprinter
  • HP Application Life Cycle Management
  • HP Test Data Management Correct
It calculates and analyzes risk for the currently selected requirement.
  • Target Cycle
  • Risk Assessment Correct
  • Impact Analysis
  • Test Coverage
It contains the actions that need to be performed during test execution
Answer: test script
It enables you to attached files, snapshots, URLs, system information, and clipboard images to provide a better explanation for a defect.
  • Description tab
  • Attachment tab Correct
  • History tab
  • Link Entities tab
It is a translating business goals/objectives into a realized software-enabled business process.
  • Creating requirements Correct
It is an independent business unit within an organization
Answer: Line of Business
It is automatically creating tests based on the requirements you define in the Requirements module.
  • Converting Requirements to Tests Correct
  • Selecting an Automatic Method for Conversion
  • Making Changes to Automatic Conversion
  • Creating the Test Plan Tree
It is the graphical representation of the requirements specification that displays the hierarchical relationship between different requirements
Answer: requirements tree
It is the variable that can be assigned a value during test execution
Answer: Parameter
It lists the tests associated with the currently selected requirement.
  • Test coverage Correct
  • Target Cycle
  • Risk assessment
  • Impact Analysis
It provides a tabular list of the defects logged for a project.
  • Grid Filter
  • Defects Grid Correct
  • Description tab
  • History tab
It provides filter fields from where you can define criteria for filtering the data listed in the Defects grid
  • Attachment tab
  • Link Entities tab
  • Grid Filter Correct
  • History tab
It standardizes the requirements definition with the rich text editor and templates.
  • Business Project Planning
  • Business Process Modeling Correct
  • Business Models
  • Business Components
It supports you through all the phases of application lifecycle management. By integrating the tasks involved in application management.
  • Application Lifecycle Management Correct
Libraries and baselines have group permissions.
  • True Correct
  • False
List the run steps for a test run
  • Source Run
  • Run steps Correct
  • Runs
Lists the business model entities linked to the currently selected requirement.
  • Business Models Linkage Correct
Lists the defects linked to the currently selected requirement.
  • Linked Defects Correct
Lists the test instance in a test set
  • Source Execution Test
  • Contained Test Correct
  • Contained Test Sets
Lists the test that are linked to a defect
  • Source Steps
  • Source Run
  • Source Test Correct
Lists the tests associated with the currently selected requirement.
  • Test Coverage Correct
Live _________ enable you to create and display a dynamic graphic representation of data related to test plans.
  • Analysis graphs Correct
Milestones are used to measure progress in project planning and tracking.
  • True Correct
Module addresses the need for a stronger connection between business process modeling, quality assurance management, and requirements definition.
  • ALM Business Models Correct
PPT stands for Planning Project and Tracking
  • True
  • False Correct
Project reports offer the following advantages, except for
  • Rich style and layout option using MS Word templates
  • Multiple configuration for multiple output formats Correct
  • Enhanced performance
  • Centralized template management
Provides a clear picture of the test building blocks and assists in the execution of the actual tests.
  • Develop the Test Sets tree Correct
Provides a tabular list of the defects logged for a project.
  • Defects grid Correct
Provides an audit trail of changes made to each defect.
  • History tab Correct
This course is taught by the mentor:
Professor Fatima Mae Osmena

Fatima Mae Osmena

Bachelor of Science in Information Technology.

All courses