Provides filter fields from where you can define criteria for filtering the data listed in the Defects grid.
Grid filterCorrect
Refreshes the scorecard table, so that it displays the most up-to-date information.
GenerateCorrect
SCA is a session/user authentication process that permits a user to enter one name and password to access multiple applications.
FALSECorrect
Sets the priority level of the requirement. Selections include 1-low, 2-medium, 3-high, ␣␣very high, and 5-urgent.
priorityCorrect
Sprinter runs auto tests in ALM from the Test Lab module
FalseCorrect
Sprinter software gives you the ability to test web or native applications using a cloud mobile provider.
TRUECorrect
Synchronization is bidirectional
True
FalseCorrect
Testing is shifting to adopt Agile and Continuous Integration methodologies.
TrueCorrect
Tests the new features of the application implemented in the release.
Cycle 1-New FeaturesCorrect
Tests the performance of the application for criteria such as number of concurrent users that the application supports and the response time of the application.
Cycle 3-Performance TestingCorrect
The ______ module allows you to view all test runs for your project in a grid.
Test RunsCorrect
The ________ module addresses the need for a stronger connection between business process modeling, quality assurance management, and requirement definition.
ALM Business ModelsCorrect
The ____________ relationship enables you to identify the status of defects to determine whether requirements have been met.
Defect-RequirementCorrect
The ALM Business module addresses the need for a stronger connection between business process modeling, quality assurance management, and requirements definition.
ModelsCorrect
The ALM Mobile Innovation testing cannot be used in Offline Testing. It has to be online all the time.
True
FalseCorrect
The ALM Synchronizer is a device that combines with what resources outside the box? (Select three.)
Rational CIearQuest, Rational RegPro, Defects between two ALM ProjectsCorrect
The built Test Steps are not being able to include calls to other tests.
True
FalseCorrect
The default defect status when the defect is assigned to the development team for review
Answer: open
The default defect status when the testing team has verified the application and the defects has been fixed
Answer: closed
The default status when a defect is reported
Answer: new
The Detailed tab enables you to select content to include in the release scope item.
FalseCorrect
The dramatic innovation for manual testing that is automatically records the testing actions and results in ALM.
HP QAInspect
HP Service Test
HP SprinterCorrect
HP Load Runner
The foundation of the Management module is the ______.
Release treeCorrect
The HP Fortify/Application Security Center identifies root cause and line of code detail of vulnerabilities.
TrueCorrect
False
The HP’s strategy and software approach for modern application delivery starts with a what?
Unified platformCorrect
The maximum number of entities in a library is 3500.
True
FalseCorrect
The name of the library folder, library, or baseline
Answer: name
The project administrator for your organization can _______ version control through ALM Site Administration.
Enable or DisableCorrect
The ratio of linked entities is 1 to 4
TrueCorrect
False
The Release Scope tab enables you to define and update release scope items.
TrueCorrect
The save options are disabled when more than one test or component is selected.
TrueCorrect
The scorecard is used by users to determine where the project milestone might be on or off track.
True
FalseCorrect
The Test Plan module enables you to ____ your application according to functionality.
DivideCorrect
The testing process begins with defining defect in the Management module.
FalseCorrect
There are three ways to open a test in Sprinter.
FalseCorrect
This allows you to design a scanner that detects the desired items in your application.
Custom scannerCorrect
This area displays the assigned or calculated values of the risk and functional complexity of an assessment requirement.
Assessment Results tabCorrect
This cycle ensures that the new features meet the expectations of the business.
Cycle 4-User Acceptance TestingCorrect
This cycle tests the new features with existing features that might have been impacted by the changes.
Cycle 2-Integrated System TestingCorrect
This indicates the cycle to which the requirement is assigned.
Test Coverage
Impact Analysis
Risk Assessment
Target CycleCorrect
This indicates the execution status of tests that are linked to a requirement.
Establish Business Criticality
Direct Cover StatusCorrect
Target Cycle
Risk Assessment
This is the two modules that have been completely redesigned as part of this release of ALM 12.0.
Requirements Management and Defects ManagementCorrect
This is useful because a new test is created specifically for a defect.
Risk-Based Setting
Traceability Matrix
Defect LinkageCorrect
Establish Business Criticality
This scanner checks your application for errors resulting from translating the application’s UI into different languages.
Localization scannerCorrect
This scanner, relevant only for web applications, checks your application for broken hyperlinks and missing referenced content.
Broken links scannerCorrect
This section enables you to open the ALM documentation library and other online resources.
Help sectionCorrect
This tab displays requirements in a hierarchical structure.
Target Cycle
Impact AnalysisCorrect
Test coverage
Risk assessment
This tab enables you to determine the business criticality, failure probability, and functional complexity of a requirement by assigning it values directly or by assigning values to a set of criteria.
Assessment Questions tabCorrect
This tab enables you to determine the business criticality, failure probability, and functional complexity of a requirement by assigning it values directly or by assigning values to a set of riteria.
Assessment Questions tabCorrect
This tab enables you to manage the analysis items.
Analysis Menus tabCorrect
This tool is for creating a cycle within a release
Answer: NewCycle
To check in more than one entity, press the CTRL key and select multiple entities for which you want to check in.
TrueCorrect
False
To checked out a previous version, select the version and click Checked Out. The Confirm dialog box opens. Click the OK button to confirm.
TrueCorrect
False
To compare two versions, press the Alt key and select each version. Click the Compare button.
FALSECorrect
To compare two versions, press the Ctrl key and select each version. Click the Compare button.
TrueCorrect
False
To create a _____, click the New button in the Plan area.
New TestCorrect
To create the Test Plan tree in the Test Plan module, you manually create folders and add tests to these folders.
TRUECorrect
To undo a checkout:Select Version =E2=86=92 Select an Entity =E2=86=92 Undo Checkout =E2=86=92 Click OK button.
True
FalseCorrect
Using the _____, you can report flaws in your application and track their repair during all stages of the application management process.
ALM Web clientCorrect
Using this you can view all versions of an entity that are stored in a baseline This includes entities in the Requirements, Business Components, Test Plan, and Test Resources modules
Answer: version control
v Calculates and analyzes risk for the currently selected requirement.
Risk AssessmentCorrect
Version control enables you to create and manage ALM entities while maintaining previous versions of these entities.
TRUECorrect
What are the characteristics of a useful Requirement?
What are the physical devices used to identify users in secure system?
Smart CardsCorrect
What are two options to start in creating cross-project graphs? i. Graph Wizardii. Analysis Wizardiii. Graph Analysisiv. Analysis Tree
i and iii
i and ii
ii and iv
i and ivCorrect
What enables you to do Risk-based Quality Management?
Calculate the level at which each requirement should be tested***Correct
What entities may be connected to a defect? (Select two.)
Defects, TestsCorrect
What is the fifth step when you want to compare entities?
Click a button on the sidebar to view additional comparison results, such as traceability and coverage The buttons displayed depend on the type of entity you are comparing
Version Control: Changes to some fields are not stored under version control
Click the Rich Text tab to compare the entity's rich text Each pane in the Rich Text Tab indicates of rich text has been added, deleted, or modified for the relevant entity versionCorrect
What is the module that enables you to manage resources used by your tests?
Test ResourcesCorrect
What is the third stage of the testing process?
Test PlanningCorrect
What organizations do support the regulation of versions? (Select three.)
Tests, Requirements, Test resourcesCorrect
What use cases for customization can only be accommodated by editing workflow code?
Sending an email to a test’s owner whenever a linked requirement is updatedCorrect
When working in Power mode, you can save manual Sprinter can import the XML file and convert it to an automated GUI test.
Integration with UFTCorrect
When you are in ________, Sprinter keeps a record of all your user actions, which you can view as a list or in the Storyboard at the end of your run.